PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing panel boards at the 1st floor Electrical Room Facing East.jpg Motorized damper controllers.jpg Block work at the detention cells divider wall Facing East.jpg Closing up the block wall at the 1st floor Sally Ports Facing North.jpg Fire Alarmn boxes at the 3rd floor Facing East.jpg Installing bathroom carriers at the 4th floor Facing West.jpg Installing black duct work at the 4th floor Facing East.jpg Installing copper piping at the 2nd floor Facing East.jpg Installing Sprinkler Main Raiser at Stair -2 Facing East 1.jpg
Previous pageNext page Fire Alarmn boxes at the 3rd floor Facing East
Fire Alarmn boxes at the 3rd floor Facing East